DEMO - Sereno Drive Pavement Rehab Project FY 19-20
The work to be done includes: traffic control, conform and wedge grind, hot mix asphalt pavement overlay, construction of curb ramps, sidewalk, curb and gutter, adjustments of utility covers, and signage and striping.
Specifications
(click to expand/collapse)
Name | Size | ||
PW9766 Sereno Drive 100% Specifications_Signed | 1.6 MB |